Sequence:

  1. Operator manually loads the radiator assembly.
  2. Machine verifies correct parts are loaded
  3. Machine verifies the barcode is correct for this assembly
  4. Machine clamps part in place
  5. Operator visually confirms part and gauge location correctness
  6. Machine stamps the radiator with an appropriate identification number
  7. Data is recorded
  8. Operator removes the assembly

 

 

 

 

 

Radiator Gage Assembly

Vehicle radiator assembly – gauge and mark.  Fully automated with the exception of initial part loading, visual check of gauging locations and final part removal.

 

 

   

 

 

 

 